Acting Minister of Petroleum Announces Gas Production Recovery After South Pars Platform Fire
Acting Minister of Petroleum Hamid Bord announced that gas production has recovered following a fire on the D platform of the South Pars gas field. The incident, which occurred on November 10, 2026, caused equipment damage on the platform but resulted in no fatalities. All personnel working on the D platform at the time of the incident were successfully rescued from the sea.
Incident response and damage assessment
The fire broke out on the D platform, located within Phase 14 of the South Pars gas field, according to reports from media reports. Emergency responders contained the fire using fire-fighting vessels and local regional resources. While the fire was successfully brought under control, the D platform sustained equipment damage during the incident.
Specialized teams were deployed to the site immediately after the fire was contained to begin necessary repairs. Reconstruction and repair operations on the D platform are expected to begin soon to restore the facility to full operational capacity. The government has prioritized the stabilization of the site to prevent further disruptions to energy supplies.
Gas production and compensation strategies
The loss of gas production caused by the incident has been addressed by utilizing the existing capacity of other platforms. Acting Minister of Petroleum Hamid Bord confirmed that the gas lost due to the incident has been compensated through these other platforms to maintain supply levels. This strategic use of alternative platform capacity has allowed for the stabilization of the current production output.
Hamid Bord stated that oil industry workers are the economic front-line soldiers of the nation. This sentiment underscores the importance of the energy sector to the national economy during the recovery process. The ability to compensate for production losses through the wider network of South Pars platforms has been essential in maintaining the stability of the energy grid.
Public conservation and winter management
To ensure a stable gas supply during the winter season, the ministry has launched a campaign to manage gas consumption. Acting Minister of Petroleum Hamid Bord requested public cooperation in gas conservation efforts to prevent shortages. The ministry has advised citizens to manage their energy usage to support the stability of the national supply.
Specifically, the ministry recommended that citizens maintain heating temperatures between 18 and 20 degrees Celsius. Following these guidelines will assist in managing the overall demand on the gas infrastructure. This conservation measure is part of a broader effort to ensure that the energy supply remains consistent for all residents throughout the winter months.
Glossary
- South Pars gas field — The field is located in the Persian Gulf. It is the biggest gas field in the world, shared between Iran and Qatar.
- Phase 14 — Development of this phase is for Persian LNG production. The contract to develop phase 14 was signed with a consortia consisting of Industrial Development and Renovation Organization (IDRO), National Iranian Drilling Company (NIDC) and Iranian Offshore Engineering and Construction Company (IOEC).
- D platform — The D platform is a facility located within Phase 14 of the South Pars gas field. It is a platform that can sustain equipment damage and requires reconstruction and repair operations to restore it to full operational capacity.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0